PM Surya Ghar Vendor List 2026: Find and Compare Registered Solar Installers

Installer Selection and Safety Guide

PM Surya Ghar Vendor List 2026

Learn how to find a vendor registered for your State or DISCOM, interpret portal ratings, compare equal-scope quotations and protect the household from weak equipment, hidden charges and unsafe payment demands.

Last Updated: July 24, 2026

Quick Answer: To claim residential Central Financial Assistance, choose a solar installer shown as registered on the official PM Surya Ghar National Portal for the relevant service area. Log in as the consumer, open the active rooftop-solar application and view the vendor-selection section available for the selected State or DISCOM. Do not use a static list copied by another website because registration, jurisdiction and ratings can change. Shortlist at least three vendors, then compare the same system capacity, DCR module details, inverter, structure, safety equipment, total GST-inclusive price, payment milestones, net-meter responsibility, five-year comprehensive maintenance and complaint support. Registration is mandatory for CFA, but registration alone is not a guarantee of the lowest price or best workmanship.

Before choosing an installer, confirm that the household and proposed system meet the PM Surya Ghar eligibility conditions . A registered vendor cannot convert an ineligible connection or non-compliant system into an approved subsidy claim.

How to Find the Official PM Surya Ghar Registered Vendor List

The most reliable vendor list is the one displayed inside the official consumer journey for the relevant electricity connection. A vendor may have State-level, multi-State or national registration, so a company operating elsewhere in India may not necessarily be selectable for your application.

  1. Open the official PM Surya Ghar National Portal and sign in through the Consumer section using the registered account details.
  2. Open the rooftop-solar application linked to the correct residential consumer number, State and DISCOM.
  3. Continue to the vendor-selection area shown for the current application stage. The exact menu label can change as the portal is updated.
  4. Review the vendor profile, registered service area, available rating information, contact details and any other portal indicators.
  5. Record the full legal or registered name instead of relying only on a local agent’s shop name, visiting card or WhatsApp profile.
  6. Contact multiple listed vendors and request the same written site-survey and quotation information from each one.
  7. Recheck the selected vendor inside the portal before signing the final agreement or making a major payment.
A copied vendor directory can become outdated. Wikisia does not reproduce a fixed nationwide list because vendor registration, service area and portal rating can change. Verify the vendor in the live official consumer dashboard before selection.

Registered Vendor, Rated Vendor and Highly Rated Vendor Are Different

Registered vendor

The vendor has been registered through the scheme framework and appears through the National Portal for an applicable jurisdiction. This is the essential vendor condition for a household claiming CFA.

Rated vendor

The vendor has enough eligible portal installations and has entered or completed the applicable rating process. The rating can include consumer feedback and, for larger tiers, additional assessments.

Unrated vendor

The vendor may be registered but may not yet have reached the rating framework’s installation threshold or completed a higher-tier rating process. “Unrated” does not automatically mean fraudulent or poor quality.

Unverified local installer

A business that cannot be confirmed through the official portal for your application should not be treated as subsidy eligible merely because it uses the scheme’s logo or claims government approval.

Correct decision rule: First verify registration. Then use rating, installation history, written technical scope, price, service capacity and local references to compare registered options.

How the PM Surya Ghar Vendor Rating Framework Works

The official framework was created to help consumers differentiate vendors on credibility, performance, quality and service. It provides for a verified symbol and rating on the National Portal when a vendor has been evaluated.

Rating category Eligible portal-installation band in the framework Main assessment components
Tier I More than 1,500 residential RTS systems Consumer feedback, sample-based quality assessment and techno-financial assessment
Tier II More than 250 and up to 1,500 residential RTS systems Consumer feedback, sample-based quality assessment and techno-financial assessment
Tier III More than 50 and up to 250 residential RTS systems Consumer feedback on quality and service
Champion Vendor concept High-performing Tier I vendors meeting the framework’s percentile condition Ecosystem leadership and dedicated service-oriented activities

What Consumer Feedback Can Consider

  • Vendor performance and installation experience
  • Quality of service
  • Time taken to complete installation
  • Post-installation service after the plant has operated for some time
  • Grievance-resolution turnaround time
  • Consumer experience with complaint resolution

What Quality Assessment Can Consider

  • Engineering compliance
  • Relevant standards and best practices
  • Installation workmanship
  • Quality of materials and processes
  • System performance
  • Safety standards
  • Post-installation service
A rating is a comparison signal, not a personal guarantee. Even a highly rated company should provide a site-specific quotation, named equipment, written payment terms and a service contact for your installation.

Use This Shortlisting Method Before Requesting Final Quotations

Shortlist factor What to verify Suggested consumer score
Portal registration Correct legal name and eligible service area Mandatory
Portal rating or history Available rating details, installation experience and service feedback 0–10
Local service capacity Technician location, response time and complaint contact 0–15
Technical transparency Named module, inverter, structure, safety and design details 0–20
Quotation clarity GST-inclusive itemised price and exclusions 0–15
Payment safety Milestone schedule, company account and receipts 0–15
Installation and metering support Portal uploads, inspection attendance and grid-connectivity scope 0–15
Warranty and maintenance Five-year system support and manufacturer warranty documents 0–10

This Wikisia scorecard is a consumer-comparison tool, not an official government rating. Use it only after checking the National Portal’s registration and rating information.

Questions the Vendor Should Answer During the Site Survey

The official model agreement places site survey, roof feasibility, structural considerations and shadow-free area assessment within the vendor’s work. A quotation prepared without looking at the actual roof should be treated cautiously.

  • How much roof area is usable after accounting for shade and access paths?
  • Why is the proposed capacity suitable for the household’s consumption?
  • Does the roof need waterproofing, reinforcement or civil modification?
  • What structure type and material will be used?
  • Will drilling or roof penetration be required?
  • Where will the inverter be installed and protected from heat and water?
  • How long will the DC and AC cable routes be?
  • What earthing, surge and lightning protection is included?
  • Does the existing connection require any update under current rules?
  • Who handles portal completion, inspection and metering coordination?
  • Which work is standard and which work will be billed separately?
Capacity and subsidy are separate decisions. Use the PM Surya Ghar subsidy calculation guide to understand the CFA ceiling, but choose plant size using electricity consumption, usable roof, sanctioned load and future demand.

How to Compare Three Vendor Quotations Fairly

Comparing only the final price can reward the quotation with the most hidden exclusions. First make the technical scope equal, then compare price.

Quotation item Vendor A Vendor B Vendor C
Eligible module DC capacity and module quantity Write exact details Write exact details Write exact details
Module manufacturer, model, wattage and DCR declaration Compare Compare Compare
Inverter make, model, phase and capacity Compare Compare Compare
Mounting-structure material and thickness Compare Compare Compare
AC/DC protection, earthing and cable scope Compare Compare Compare
Net-meter supply, testing and approval support Included/excluded Included/excluded Included/excluded
Civil, waterproofing and additional roof work Included/excluded Included/excluded Included/excluded
Monitoring access and consumer training Included/excluded Included/excluded Included/excluded
GST-inclusive total price Record amount Record amount Record amount
Payment milestones Record terms Record terms Record terms
Installation timeline Record commitment Record commitment Record commitment
Five-year service response Record commitment Record commitment Record commitment
Do not compare “net cost after subsidy” alone. Subsidy is released through the official process after eligible installation and approval. A vendor’s advertised net figure can hide exclusions or assume the maximum CFA even when the household installs less than 3 kW.

Verify the Solar Modules and Inverter Before Signing

Solar-Module Checks

  • Manufacturer and exact model
  • Wattage of each module and total DC capacity
  • DCR compliance for a CFA-supported installation
  • Unique serial numbers and traceability information
  • Product and performance warranty
  • Applicable standards and certifications
  • Replacement process if a module fails

Inverter Checks

  • Manufacturer, model and serial number
  • Single-phase or three-phase suitability
  • Rated input and output capacity
  • Grid-protection and anti-islanding functions
  • Ingress-protection rating and installation location
  • Monitoring app or portal access
  • Product warranty and local service route

The registered vendor should provide the technical records listed in the PM Surya Ghar document checklist , including equipment specifications, serial numbers, warranties, plant layout, electrical Single Line Diagram and structure information.

What the Vendor-Consumer Agreement Should Contain

A written agreement is essential because the consumer and vendor mutually decide project design, additional work, cost and payment terms. The official guidelines include a model draft agreement covering design, supply, installation, commissioning, five-year comprehensive maintenance and warranty.

  • Full registered names and addresses of both parties
  • Application, consumer number and installation address
  • Exact system capacity and equipment schedule
  • Site-survey and roof-work scope
  • Design, safety and technical standards
  • Installation and commissioning responsibilities
  • Portal documents and Project Completion Report support
  • Net-meter and grid-connectivity responsibilities
  • Total project cost, GST and extra-work rates
  • Milestone-based payment schedule
  • System and component warranties
  • Five-year operation and maintenance scope
  • Complaint contact and response process
  • Delay, cancellation and dispute terms
  • Handover documents and consumer training
Read the dispute clause carefully. The model agreement states that consumer-vendor disputes concerning supply, installation, maintenance or payment are to be settled between the parties or according to law; MNRE and the DISCOM are not automatically parties to that private dispute.

Use a Milestone-Based Vendor Payment Schedule

The official model agreement allows payment terms to be mutually decided and specifically recognises milestone-based payment. The exact percentages are commercial terms, but the consumer should avoid losing all leverage before installation and approval.

Possible milestone Evidence before payment Consumer protection
Booking or agreement Signed agreement, portal registration check and itemised quotation Keep the advance proportionate and obtain a company receipt
Equipment delivery Physical module/inverter verification and serial-number record Do not accept substituted models without written approval
Installation completion System installed, safety checks and no unresolved roof damage Retain an amount for commissioning and documents
Portal completion and inspection readiness Uploaded plant data, invoice and required photographs Confirm the application is not waiting on the vendor
Commissioning and handover Metering, warranties, drawings, login access and completion documents Pay the final balance only according to the written milestone
  • Do not send money to an unrelated personal account without written company authorisation and receipt.
  • Do not pay a “government subsidy release fee” to the vendor.
  • Do not approve a UPI collect request to receive subsidy.
  • Do not sign a blank payment schedule.
  • Do not treat a cash note or WhatsApp message as a complete tax invoice.

Vendor Responsibilities During Installation and Commissioning

Under the model framework, the vendor’s work extends beyond placing panels on the roof. The vendor is responsible for a compliant design, supply, installation, testing, commissioning and the necessary documentation within the agreed scope.

Site and Design

Roof assessment, shade review, structural considerations, drawings and component selection for safety and performance.

Installation Quality

Modules, inverter, structure, cable, protection, earthing and weatherproof work according to the applicable standards.

Portal and Documents

Technical specifications, certificates, serial numbers, warranties, drawings and assistance with signed completion records.

Meter and Grid Connection

Scope for net-meter procurement or supply, testing, approvals and grid connection as provided in the applicable agreement and local process.

Testing and Commissioning

Vendor presence and support when the DISCOM or authorised agency tests and commissions the system.

Consumer Handover

Monitoring access, shutdown guidance, cleaning instructions, warranties, invoice and complaint contact.

After installation, track the vendor-controlled and DISCOM-controlled stages using the PM Surya Ghar application-status guide .

Five-Year Warranty and Maintenance: What to Confirm

The official model agreement covers a five-year comprehensive maintenance period from commissioning. It also states that system warranty certificates and individual component warranty documents should be provided to the consumer.

  • Starting date of the five-year service period
  • Whether labour, travel, inspection and routine checks are included
  • Response time for complete shutdown and partial-generation complaints
  • Process for module and inverter manufacturer warranty claims
  • Responsibility for replacing failed protection devices or cabling
  • Cleaning guidance and consumer responsibilities
  • Monitoring of generation and system health
  • Escalation contact when the local technician does not respond
  • Service arrangement if the vendor closes the local office
Manufacturer warranty and vendor service are different. A long module performance warranty does not replace the vendor’s installation, maintenance and complaint responsibilities.

PM Surya Ghar Vendor Red Flags

Registration Cannot Be Verified

The seller shows a certificate image or scheme logo but cannot be selected through the live official portal for the connection.

Guaranteed ₹78,000 for Everyone

The amount depends on eligible installed capacity and approval. Smaller systems do not receive the maximum standard CFA.

Equipment Model Is “Subject to Availability”

This can allow substitution after payment. The agreement should identify acceptable models and written approval for changes.

Full Advance Before Survey

A large irreversible payment before roof inspection, written scope and portal verification exposes the consumer to unnecessary risk.

No GST Invoice

The vendor asks for cash or personal-account payment and refuses an itemised company invoice and receipt.

Non-DCR Panels Offered for Subsidy

The seller promises subsidy but refuses to document DCR compliance.

OTP and Bank PIN Request

No installer needs card PIN, CVV, UPI PIN or banking password to process CFA.

Five-Year Service Missing

The seller discusses only panel warranty and avoids written system maintenance and local complaint support.

Can You Change the Selected PM Surya Ghar Vendor?

The practical answer depends on the application stage, portal controls and the signed commercial agreement. Changing before installation is usually less complex than changing after equipment purchase, roof work or payment.

  1. Check the current consumer dashboard for a vendor-selection or change option.
  2. Review the signed agreement’s cancellation, refund and material clauses.
  3. Record how much has been paid and which goods or services have already been delivered.
  4. Ask the current vendor for written cancellation and a final account statement.
  5. Do not select a replacement until the portal record and existing contractual issue are clear.
  6. Select the replacement only from the official registered-vendor options shown for the application.
  7. Obtain a fresh survey, quotation, agreement and equipment schedule.
Do not pay two vendors for the same incomplete stage. A portal vendor change does not automatically cancel a private contract or guarantee refund of an earlier payment.

What Evidence Should You Keep for a Vendor Complaint?

  • Vendor profile or registration screenshot from the official portal
  • Signed vendor-consumer agreement
  • Every quotation and revised quotation
  • Invoice, receipts and bank or UPI transaction references
  • Promised equipment models and installed serial numbers
  • Photographs of incomplete, damaged or unsafe work
  • Portal status and returned observations
  • DISCOM inspection report or correction note
  • Emails, complaint tickets and dated messages
  • Warranty and maintenance documents
  • A clear summary of the resolution requested

Use the official portal grievance mechanism and the vendor’s documented complaint channel where appropriate. A technical or payment dispute may also require legal or consumer-remedy channels because the model agreement does not make MNRE or the DISCOM a party to every private vendor dispute.

Frequently Asked Questions

Where can I see the PM Surya Ghar vendor list?

Log in to the official National Portal as the consumer and open the vendor-selection area for the relevant residential application, State and DISCOM. Use the live portal instead of a copied static list.

Is a registered vendor mandatory for subsidy?

Yes. The residential CFA guidelines require the installation to be undertaken through a vendor registered on the National Portal.

Does registered mean government guaranteed?

No. Registration permits participation under the scheme framework, but the consumer must still compare price, design, equipment, workmanship, service and contractual terms.

Is an unrated vendor automatically unsafe?

No. The rating framework uses installation thresholds and different assessment tiers. A vendor may be registered but not yet rated. Verify registration and perform additional due diligence.

Should I always select the highest-rated vendor?

Rating is useful, but also compare the local service team, site-specific design, itemised price, equipment, installation schedule and written warranty.

Does the Government fix the vendor’s final price?

The consumer and vendor mutually decide project cost and payment terms. Site conditions, equipment and additional work can change the final quotation.

Can the vendor charge separately for roof modification?

Site-specific additional work may be charged separately when it is required, but the vendor should provide a written estimate and applicable GST invoice before the consumer approves it.

Is net-meter work the vendor’s responsibility?

The official model agreement places net-meter supply or procurement, testing, approvals and grid connection within the vendor scope. Confirm how this is implemented under the current local DISCOM process and written agreement.

How long must the vendor maintain the system?

The model agreement includes five years of comprehensive operation and maintenance from commissioning, along with system and component warranty documentation.

Can the vendor take my subsidy directly?

The standard scheme process sends approved CFA through the official consumer or applicable loan-account route. Do not assign control of bank credentials or accept an unofficial subsidy-adjustment arrangement without verified written authority.

Can I change the vendor after selection?

It may be possible depending on the portal stage and current controls, but the private agreement, payment and delivered material must also be resolved. Check the dashboard and official support before selecting a replacement.

What should I do if the vendor delays portal documents?

Send a written request listing the missing invoice, technical records, completion report or photographs. Save the application-status screenshot and escalate through the vendor and official grievance channels when necessary.

Select the Vendor on Evidence, Not on the Lowest Headline Price

First verify the vendor through the live National Portal. Next compare three registered installers on the same system capacity and technical scope. A responsible vendor should explain the roof design, identify the module and inverter, document DCR compliance, disclose every extra charge, accept milestone payments and provide commissioning and five-year service support in writing.

Keep the complete PM Surya Ghar scheme guide , the installation-document checklist , and the application-status guide available until the system is commissioned and the subsidy process is complete.

Disclaimer

Wikisia is an independent informational website and is not affiliated with the Ministry of New and Renewable Energy, PM Surya Ghar Muft Bijli Yojana, any DISCOM, registered solar vendor, equipment manufacturer, bank or government authority.

Vendor registration, service area, portal rating, contact information and commercial terms can change. Wikisia does not endorse or rank an individual installer. Verify the live National Portal profile, inspect the written agreement and seek qualified technical or legal advice where necessary before paying a vendor, altering a roof, installing electrical equipment or entering a dispute.

Back to top ↑

Leave a Comment