PM Surya Ghar Apply Online 2026
Follow the current end-to-end application process—from consumer registration and rooftop-solar selection to vendor installation, DISCOM inspection, net metering and direct subsidy payment.
Last Updated: July 22, 2026
Application Process Covered Here
- Before starting
- Four application phases
- Portal registration
- Consumer verification
- Selecting system capacity
- Approval and load process
- Registered vendor selection
- Installation and portal update
- DISCOM inspection and net meter
- Subsidy claim and bank verification
- Application stages
- Common errors
- Fraud and payment safety
- Frequently asked questions
Before You Start the PM Surya Ghar Application
A smooth application begins with the correct electricity-account information. Do not begin by selecting a vendor or paying for equipment. First confirm that the residential consumer record, roof availability and proposed system are suitable.
- Keep a recent residential electricity bill in front of you.
- Confirm the exact State, District, DISCOM and consumer number.
- Use a mobile number and email address that you can access regularly.
- Check whether the consumer name and bank-account name are consistent.
- Review at least six to twelve months of electricity consumption.
- Confirm that you have permission and practical access to the roof.
- Do not finalise system capacity before a roof and load assessment.
- Create a folder for portal acknowledgements, quotations, invoices and photographs.
The Entire Application in Four Clear Phases
Register and Apply
Fetch the residential consumer account, complete the online application and review the proposed capacity and connection details.
Select and Install
Compare registered vendors, sign written terms and install a technically compliant rooftop-solar system using eligible equipment.
Inspect and Meter
Upload installation evidence, complete DISCOM inspection and activate the approved metering arrangement.
Verify and Receive CFA
Complete bank verification and the current e-token or portal claim process, then track the direct payment.
Step 1: Open the National Portal and Start Registration
- Open the official PM Surya Ghar website and choose the option to apply for rooftop solar or enter the consumer-registration area.
- Select the State or Union Territory where the electricity connection is located. Do not select the applicant’s current location when it differs from the installation address.
- Select the District and the electricity distribution company shown on the latest bill.
- Enter the residential consumer number exactly as printed by the DISCOM. Some utilities use terms such as Consumer ID, Account Number, CA Number, Service Number or K Number.
- Use the portal’s fetch-details function where available. Review the prefilled consumer name, address and connection data before continuing.
- Complete mobile-number or email verification and create the consumer login according to the current portal screen.
Step 2: Verify the Electricity Consumer Details
A large number of application problems begin with incorrect utility information. Never continue merely because the portal accepts an entry. Compare every fetched detail with the latest electricity bill.
| Portal detail | What to compare | What to do if it is wrong |
|---|---|---|
| Consumer name | Latest electricity bill and DISCOM account | Request correction through the DISCOM before subsidy-stage bank verification |
| Installation address | Actual rooftop-solar premises | Do not submit an installation against the wrong service address |
| Tariff category | Residential category shown by the utility | Clarify mixed-use or commercial classification with the DISCOM |
| Sanctioned load | Bill, consumer portal and proposed solar capacity | Use the current auto-load or DISCOM process where applicable |
| Mobile number | Number available for OTP and status communication | Update it through the official process rather than using an agent’s number |
| Earlier solar record | Previous installation and subsidy history | Disclose an existing subsidised plant before claiming additional CFA |
Take a screenshot or save the application acknowledgement after successful submission. Record the application number separately so that it is not lost if the login mobile number changes.
Step 3: Choose a Suitable Rooftop-Solar Capacity
The portal may provide a calculator or capacity guidance, but the final system should be based on actual consumption, usable roof area, sanctioned load, shading, state metering rules and household budget.
| Decision factor | Why it matters |
|---|---|
| Monthly electricity units | Helps estimate how much daytime and annual generation may be useful |
| Daytime consumption | Higher daytime use can improve direct self-consumption of solar power |
| Roof area and shade | Determines whether the planned module capacity can be installed effectively |
| Sanctioned load | Affects the connection and load-enhancement process under current rules |
| Subsidy cap | Standard household CFA reaches its maximum at 3 kW |
| Future electricity use | Air-conditioning, electric cooking or EV charging may increase demand |
Step 4: Understand the Current Approval and Load Process
The application process has been simplified since the original scheme launch. A March 2026 official update stated that technical feasibility requirements had been waived and auto load enhancement introduced up to 10 kW. It also stated that the net-metering agreement had been made part of the National Portal application.
This simplification does not remove the requirement for a safe, compliant installation or final DISCOM inspection. Consumers should follow the exact workflow displayed for their connection because utility integration and local regulatory implementation can still affect individual portal screens.
Step 5: Select a Vendor Registered on the National Portal
Once the application reaches the appropriate stage, compare vendors shown through the official scheme system. Registration does not mean that every vendor offers the same equipment, price or service quality.
- Confirm registration for your State or DISCOM service area.
- Request a written site-survey report and capacity recommendation.
- Compare at least two or three itemised quotations.
- Check solar-module make, model, wattage and DCR compliance.
- Check inverter capacity, protection devices, structure and earthing.
- Confirm taxes, meter-related charges and any work excluded from the quotation.
- Ask who uploads geo-tagged photographs and installation documents.
- Review the payment schedule instead of paying the full amount upfront.
- Keep the signed vendor-consumer agreement and every payment receipt.
- Confirm warranty, five-year service commitment and local complaint contact.
Step 6: Complete Installation and Update the Portal
The vendor should install the system according to the written quotation, technical specifications and applicable safety standards. Before signing the completion documents, compare the physical equipment with the agreed models.
Check the Installed Equipment
- Number, wattage and serial details of solar modules
- DCR-related module documentation
- Inverter make, model, serial number and capacity
- Mounting structure and roof sealing
- DC and AC cabling, isolators and protection devices
- Earthing and lightning-protection arrangement where applicable
- Generation-monitoring application or display access
- Safety labels and shutdown instructions
Portal Information After Installation
The completed installation is updated through the consumer login. The required information may include installed capacity, module and inverter details, vendor invoice, system documents and geo-tagged photographs. The consumer should review every uploaded entry even when the vendor assists with data submission.
Step 7: DISCOM Inspection, Net Meter and Commissioning
After the plant details are submitted, the DISCOM checks the installation under the applicable verification process. The inspection may cover module capacity, equipment details, protection, wiring, metering, photographs and compliance with the portal checklist.
| Inspection outcome | Meaning | Next action |
|---|---|---|
| Approved | The installation has satisfied the relevant verification stage | Complete pending metering, bank or subsidy actions shown on the portal |
| Returned for correction | Information or installation evidence requires a change | Read the exact observation and correct only the stated issue |
| Pending | Inspection, document review or utility action has not been completed | Track through the portal and contact the listed DISCOM support if delayed |
| Rejected | The claim or installation did not meet a required condition | Obtain the recorded reason before filing a correction or grievance |
The approved metering arrangement determines how imported electricity and solar export are accounted for. A net meter is not simply a normal meter installed by the vendor. It must follow the applicable DISCOM and state regulatory procedure.
Step 8: Submit Bank Details and Complete the Subsidy Claim
Central Financial Assistance is processed after the installation and DISCOM approval stages. The National Portal is designed to support the online journey from application to direct subsidy disbursal into the residential consumer’s bank account.
- Use a bank account belonging to the concerned residential consumer.
- Enter the account number and IFSC carefully.
- Upload the requested cancelled cheque, passbook or bank statement clearly.
- Review the consumer-name and bank-name consistency.
- Complete the current e-token or redemption process where shown by the portal.
- Track the payment stage from the consumer login.
- Save the UTR or payment reference after credit.
The operational framework provides for CFA processing after DISCOM approval, but the full time from registration to bank credit depends on installation, inspection, document quality, metering and validation. A “15-day subsidy” claim should not be interpreted as 15 days from the initial online registration.
Typical PM Surya Ghar Application Stages
Exact labels can change as the portal is updated, but the application usually moves through the following functional stages:
| Functional stage | What is happening | Consumer action |
|---|---|---|
| Consumer registered | The electricity account has been linked to a portal login | Save login details and application reference |
| Application submitted | Proposed rooftop-solar information has been recorded | Review the dashboard for the next permitted action |
| Vendor selected | A registered installer has been chosen | Finalise written technical and commercial terms |
| Installation completed | The plant has been installed at the residential premises | Verify equipment and upload completion details |
| Inspection or metering pending | The DISCOM must verify and commission the installation | Keep access, documents and vendor support ready |
| Bank verification pending | The claim requires valid bank-account proof | Correct unclear or mismatched banking information |
| CFA processed | The approved assistance has entered the payment process | Track the UTR or credit entry |
Common Online Application Errors and Solutions
Consumer Details Not Found
Recheck State, District, DISCOM and consumer-number format. Compare the latest bill and use the official DISCOM account before raising a portal complaint.
Wrong Name or Address
The National Portal may fetch utility records. Correct the source record through the DISCOM rather than repeatedly entering a different spelling.
OTP Not Received
Check mobile signal, spam folders and the registered contact details. Avoid creating multiple applications with different numbers.
Vendor Not Visible
Confirm the correct State and DISCOM service area. A vendor registered elsewhere may not appear for the selected connection.
Application Stuck After Installation
Check for missing photographs, incorrect module capacity, invoice issues or pending DISCOM inspection instead of submitting a duplicate application.
Bank Verification Failed
Recheck account number, IFSC, consumer-name alignment and the clarity of uploaded bank proof. Never pay anyone to “unlock” bank verification.
Application and Vendor Fraud Safety Checklist
- Do not register through a website whose address only resembles the official portal.
- Do not share an OTP with a vendor or caller unless you understand the exact action being authorised.
- Do not believe a claim that every household receives exactly ₹78,000.
- Do not pay an “approval fee” into a personal bank or UPI account without official proof.
- Do not accept non-DCR modules when the quotation promises subsidy eligibility.
- Do not sign a blank form, completion report or inspection paper.
- Do not allow the vendor to keep the only copy of your portal login and documents.
- Do not submit duplicate applications to solve a pending-stage problem.
A registered vendor may legitimately assist with technical documents and portal entries, but the consumer should retain control of the application, verify every submission and keep an independent record of all payments and equipment.
Frequently Asked Questions
Where can I apply online for PM Surya Ghar?
Apply through the official National Portal at pmsuryaghar.gov.in. The application is linked to the residential electricity consumer account and the concerned DISCOM.
Is online registration free?
Consumers should not pay a private agent merely for access to the government registration portal. Installation, equipment, metering and other legitimate project costs are separate from portal access.
Can I apply using a mobile phone?
The official portal can be accessed online, but uploading documents and reviewing long forms may be easier on a larger screen. Use a secure device and save copies of acknowledgements.
Do I need technical feasibility approval before choosing a vendor?
The process was simplified by waiving the technical-feasibility requirement and introducing auto load enhancement up to 10 kW. Follow the current action sequence displayed for your connection on the National Portal.
Can I choose any local solar installer?
To claim Central Financial Assistance, the consumer must choose a vendor registered on the National Portal for the relevant service area.
Can the vendor submit the entire application for me?
A vendor may assist with installation documents and portal entries, but the consumer should control the login, verify submitted data and never disclose sensitive banking credentials or payment PINs.
When should I enter bank details?
Complete the bank-verification and subsidy actions shown on the portal after the relevant installation and approval stages. Enter details only within the verified official process.
Is the subsidy paid before installation?
The standard consumer process requires completion, inspection and approval before eligible Central Financial Assistance is processed. Do not assume the subsidy is an advance payment to the vendor.
What should I do if my application is pending?
Identify the exact pending stage first. Check the consumer dashboard, recorded observations, DISCOM contact and official support channels. Avoid creating a duplicate registration unless officially instructed.
Can I edit an incorrect application?
Correction options depend on the field and application stage. Utility-source details may require DISCOM correction, while some portal fields may be returned for editing. Preserve the application number and seek stage-specific support.
Complete the Application Without Losing Control of It
Treat the application as a household infrastructure purchase, not as a simple online form. Register with accurate consumer details, choose capacity using consumption and roof conditions, compare registered vendors and document every transaction. After installation, verify the uploaded plant information and remain involved until metering, inspection, bank validation and CFA payment are complete.
The portal has made the process easier, but it cannot replace careful vendor selection, safe electrical work or correct documents. When the dashboard and an agent’s advice conflict, rely on the official portal, written DISCOM communication and current MNRE guidance.
Official Sources
Disclaimer
Wikisia is an independent informational website and is not affiliated with the Ministry of New and Renewable Energy, PM Surya Ghar Muft Bijli Yojana, any DISCOM, bank, solar vendor or government authority.
Portal screens, field names, approval steps, technical rules, metering arrangements, support contacts and subsidy procedures can change. Consumers should follow the current instructions displayed on the official National Portal and verify connection-specific requirements with the concerned DISCOM before applying, installing equipment, making a payment or submitting bank information.