PM Surya Ghar Feasibility Approval 2026
Understand the simplified 10 kW regulatory process, automatic load enhancement, situations that still require DISCOM attention, and the correct response when the dashboard shows feasibility, load or approval as pending.
Last Updated: July 24, 2026
Applicants should first confirm the residential connection and installation category through the PM Surya Ghar eligibility checklist . A simplified approval process does not make a commercial connection, off-grid system or non-compliant installation eligible for residential CFA.
Feasibility and Approval Questions Covered Here
- What feasibility approval means
- Current 10 kW simplified rule
- Old process versus current process
- Automatic load enhancement
- What the DISCOM still checks
- Capacity-based situations
- Feasibility status pending
- Returned or rejected approval
- Wrong sanctioned load
- Single-phase and three-phase issues
- Apartment and RWA cases
- Vendor responsibilities
- Evidence to keep
- Escalation process
- Frequently asked questions
What Did Technical Feasibility Approval Traditionally Mean?
Technical feasibility was the electricity utility’s pre-installation review of whether a proposed rooftop-solar plant could be connected to a particular consumer account and local distribution network. It could involve sanctioned load, proposed capacity, phase, transformer or feeder conditions, metering arrangement and utility technical rules.
Consumer Connection
Whether the consumer number, address, tariff category and sanctioned load were suitable for the proposed residential rooftop system.
Grid Interface
Whether the proposed inverter and export arrangement could connect safely to the local distribution system.
Metering Method
Whether net metering, net billing, gross metering or another approved mechanism applied to the connection.
Capacity Permission
Whether the proposed solar capacity matched utility and State regulatory limits.
Older portal instructions often showed a separate sequence: apply, wait for feasibility approval, select a vendor, install and then request inspection. The scheme has since moved toward a simpler digital approval model.
Current Rule: Simplified Approval and Auto Load Enhancement up to 10 kW
In its March 25, 2026 update, the Government stated that regulatory approval had been simplified by waiving the technical-feasibility requirement and introducing automatic load enhancement up to 10 kW. The same update described a fully online process through the National Portal and said that the net-metering agreement had become part of the portal application.
Simplified Up to 10 kW
The scheme’s current public position removes the old technical-feasibility requirement and introduces automatic load enhancement up to 10 kW.
Verify Above 10 kW
Larger systems can require connection-specific and State-specific approval. Follow the live portal and written DISCOM procedure.
DISCOM Final Role Remains
The utility still handles consumer records, inspection, metering, commissioning and relevant approval updates.
Not automatic Scheme Eligibility
Simplification does not waive DCR, registered-vendor, residential-connection, technical-safety or inspection requirements.
Old Feasibility Process Versus the Current 2026 Flow
| Process area | Older common workflow | Current public scheme position |
|---|---|---|
| Pre-installation feasibility | Consumer often waited for a separate DISCOM approval | Technical-feasibility requirement has been waived under the simplified process |
| Load enhancement | Separate application and utility action could be required | Automatic load enhancement introduced up to 10 kW |
| Vendor selection | Often shown only after feasibility sanction | National Portal supports application and registered-vendor selection in the simplified digital journey |
| Net-meter agreement | Could be processed separately through DISCOM paperwork | Government reports that it has been made part of the National Portal application |
| Physical inspection | Required after installation | Still required as part of compliance and approval |
| State-specific implementation | Varied by DISCOM | Live portal and State regulatory rules still control connection-specific details |
What Does Automatic Load Enhancement up to 10 kW Mean?
Sanctioned load is the level of electricity demand approved for a consumer connection. A proposed rooftop-solar capacity can interact with the connection’s sanctioned load and phase requirements. Automatic load enhancement is intended to reduce the need for a separate manual load-increase procedure for systems within the stated limit.
It should not be interpreted as a promise that every house will receive a 10 kW system, that the local network requires no technical compliance, or that the consumer can change internal wiring without assessment.
| Situation | Likely interpretation | Consumer action |
|---|---|---|
| Existing load already supports proposed system | No separate manual load-enhancement issue may arise | Continue according to the portal workflow |
| Proposed system is within 10 kW but above recorded load | Automatic load-enhancement feature may apply | Check that the portal and DISCOM record update correctly |
| Proposed system exceeds 10 kW | The simplified automatic limit does not cover the full capacity | Obtain the current connection-specific DISCOM procedure |
| Wrong load shown in portal | The source utility record may be outdated or unsynchronised | Correct the DISCOM consumer record before installation |
| Internal wiring is undersized | Portal load enhancement does not physically upgrade household wiring | Use a competent technical assessment and vendor design |
| Phase change may be needed | Connection configuration can require utility action | Confirm phase and inverter compatibility with the DISCOM and vendor |
What the DISCOM Still Checks After Feasibility Simplification
- Correct residential consumer number and service address
- Tariff category and connection record
- Relevant sanctioned-load and phase information
- Installed solar-module capacity
- Inverter and grid-protection compliance
- Wiring, isolation, earthing and safety requirements
- Metering readiness and approved settlement mechanism
- Portal documents and required geo-tagged photographs
- Match between physical system, invoice and submitted data
- Final inspection, commissioning and portal approval
The PM Surya Ghar net-meter process guide explains how inspection, metering agreement, meter installation and commissioning follow the installation stage.
Feasibility Position for Different Rooftop-Solar Capacities
| Proposed capacity | Approval context | Subsidy reminder |
|---|---|---|
| 1 kW | Falls within the simplified up-to-10-kW category | Standard CFA can be ₹30,000 if all conditions are met |
| 2 kW | Falls within the simplified category | Standard CFA can be ₹60,000 |
| 3 kW | Falls within the simplified category | Standard household CFA reaches ₹78,000 |
| 5 kW | Falls within the stated simplified approval and auto-load range | Household CFA remains capped at the eligible first 3 kW |
| 10 kW | At the upper boundary of the stated automatic load-enhancement limit | Standard household CFA remains capped at ₹78,000 |
| Above 10 kW | May require additional DISCOM or State regulatory procedure | No extra household CFA beyond the eligible 3 kW ceiling |
Use the PM Surya Ghar subsidy calculation guide to separate capacity approval from CFA calculation. A 10 kW approval does not mean that all 10 kW receives residential subsidy.
Dashboard Shows Feasibility Approval Pending: What Should You Do?
- Open the detailed observation, not only the summary status. Check whether the stage asks for any consumer action.
- Confirm that the State, District, DISCOM, consumer number, address and proposed capacity are correct.
- Check whether an old or duplicate application exists for the same consumer number.
- Verify whether the proposed system is up to 10 kW or above the simplified limit.
- Look for a load, phase, tariff-category or utility-record mismatch.
- Save a dated dashboard screenshot and application acknowledgement.
- Contact the concerned DISCOM with the exact application ID and ask whether the stage is an internal portal action, a record correction or an additional approval.
- Use the National Portal grievance route when the application remains unchanged after the documented DISCOM action.
Feasibility or Load Approval Returned or Rejected
A returned case usually needs correction. A rejection can involve a more fundamental connection, capacity or technical issue. Always obtain the exact recorded reason.
Incorrect Consumer Record
The name, address, tariff, load or phase in the DISCOM database does not match the application.
Capacity Entry Error
The proposed capacity may be entered in the wrong field, unit or connection record.
Non-Residential Connection
A commercial or other non-residential tariff cannot receive household CFA merely by requesting feasibility approval.
Unsupported Metering Arrangement
The requested net, group, virtual or behind-the-meter configuration may not satisfy the applicable State rules.
Phase or Load Issue
The connection configuration may require a utility update before the planned inverter or capacity can proceed.
Duplicate Application
More than one open application against the same consumer number can cause conflicting approval stages.
Correction Sequence
- Download or screenshot the exact return or rejection observation.
- Identify the source record that is wrong.
- Correct the electricity-account data through the DISCOM when the portal only fetches it.
- Correct the portal field where editing is permitted.
- Upload only the requested supporting evidence.
- Resubmit and save the new acknowledgement.
- Escalate with both the old observation and proof of correction if the stage does not change.
Sanctioned Load Is Wrong on the Portal or Electricity Bill
The National Portal can fetch consumer information from the DISCOM. When the sanctioned load is wrong in the source utility record, repeatedly typing a different value may not solve the issue.
| Problem | Likely source | Correct response |
|---|---|---|
| Bill shows old load | DISCOM consumer database | Submit the official load-record correction or update request |
| Portal and bill differ | Data synchronisation | Save both records and raise a portal/DISCOM sync complaint |
| Vendor selected an unsuitable capacity | Weak site or consumption assessment | Revise the design before installation and document the change |
| Auto load enhancement not reflected | Pending portal or utility action | Obtain a written reference from the DISCOM instead of creating a duplicate application |
| Physical wiring does not support the new configuration | Premises electrical system | Use a qualified technical assessment; portal approval does not replace physical upgrade work |
Preserve the latest bill and consumer records listed in the PM Surya Ghar documents checklist .
Single-Phase, Three-Phase and Inverter Compatibility
A simplified approval process does not remove the need to match the inverter and connection configuration. State regulations and DISCOM standards can determine when a particular capacity requires a phase change or three-phase inverter.
- Check the connection phase shown on the bill and meter.
- Ask the vendor to state the proposed inverter phase in writing.
- Confirm whether a phase conversion is included in the quotation.
- Obtain the current DISCOM requirement instead of using another State’s rule.
- Do not allow a vendor to install first and promise to “adjust the phase later.”
- Preserve the load and phase update acknowledgement.
Feasibility Approval for Apartments, RWAs and Shared Roofs
An apartment case may involve an individual residential meter, a common-facility connection, shared roof rights, multiple participating consumers or virtual/group net metering. These factors can require more than the straightforward individual-house flow.
| Apartment situation | Main approval issue | Evidence to prepare |
|---|---|---|
| Individual flat connection with allocated roof space | Roof permission and metering feasibility | Association approval, consumer bill and roof allocation |
| RWA common-facility plant | Common connection, supported capacity and eligible use | Resolution, common bill, household count and design |
| Virtual net metering | State regulatory approval and credit allocation | Participating connection list and allocation schedule |
| Group net metering | Connection relationship and approved adjustment method | Consumer details, ownership and metering proposal |
| Shared roof with competing claims | Legal right and usable area | Society resolution, co-owner consent and site plan |
What the Registered Vendor Must Do During the Approval Stage
- Review the correct consumer account and installation address
- Assess roof area, shade, structure and electrical route
- Recommend capacity using consumption and connection information
- Identify the inverter phase and grid-protection requirements
- Confirm DCR-compliant module supply for CFA
- Document any load, phase or meter work in the quotation
- Follow the National Portal and DISCOM process
- Avoid installation while a material connection error remains unresolved
- Provide technical documents needed for inspection and commissioning
- Attend or support the required DISCOM verification
Compare installers through the PM Surya Ghar registered-vendor selection guide . A vendor who says “feasibility is waived” should still provide a compliant design, written scope and inspection-ready installation.
Documents and Evidence to Keep for Feasibility or Load Issues
- Latest residential electricity bill
- Application acknowledgement and application ID
- Consumer-profile screenshot
- Proposed solar capacity
- Sanctioned-load and phase information
- Any load-enhancement acknowledgement
- Feasibility, return or rejection observation
- DISCOM complaint or service-request number
- Vendor site-survey and proposed design
- Corrected bill or consumer record
- Portal screenshots before and after correction
- Written clarification from the DISCOM
How to Escalate a Feasibility or Load-Approval Delay
- Confirm that the application contains the correct consumer number, State and DISCOM.
- Save the current status and detailed observation.
- Contact the local DISCOM office or official support channel responsible for rooftop solar, load and metering.
- Ask whether the stage requires source-record correction, internal approval, automatic load update or a process for capacity above 10 kW.
- Obtain a complaint number and promised action date.
- Recheck the National Portal after the utility action has had time to synchronise.
- Raise an official portal grievance when the dashboard remains unchanged despite documented correction or approval.
“Application [ID] for consumer number [number] shows [exact stage] since [date]. The proposed capacity is [kW]. The DISCOM completed/confirmed [action] under reference [number] on [date], but the National Portal has not updated. Please verify the consumer record and update the pending stage.”
Frequently Asked Questions
Is technical feasibility approval still required under PM Surya Ghar?
The Government stated in March 2026 that the technical-feasibility requirement had been waived as part of the simplified regulatory approval process. Follow the current National Portal and connection-specific DISCOM action.
What is the 10 kW auto load-enhancement rule?
The official update states that automatic load enhancement has been introduced up to 10 kW. It is intended to remove a separate manual burden within the stated range, but it does not replace safe design, inspection or metering.
Why does my dashboard still show feasibility approval?
The label may be part of a utility-integrated or legacy workflow. Open the detailed action and ask the DISCOM whether it represents an internal update, record correction or a case outside the simplified path.
Can I select a vendor before feasibility approval?
The current scheme has a simplified National Portal journey and registered-vendor selection. Follow the live sequence shown for your consumer application rather than an old tutorial.
Does feasibility waiver mean I can install any capacity?
No. Capacity must still comply with the residential connection, roof, system design, State regulations, utility rules and inspection. The stated automatic load-enhancement limit is up to 10 kW.
What happens for a system above 10 kW?
The official automatic limit does not cover capacity above 10 kW. Obtain the current DISCOM and State regulatory procedure before signing the final design.
Does 10 kW receive subsidy on the full capacity?
No. Standard household CFA is capped at the eligible first 3 kW, even when a larger rooftop system is approved and installed.
Can the vendor charge for feasibility approval?
Ask for an itemised written explanation of every legitimate utility, design or service charge. Do not pay an unofficial “approval guarantee” fee to an agent.
Does automatic load enhancement upgrade my home wiring?
No. It concerns the connection process. Internal wiring, protection, earthing, phase and equipment suitability still require technical assessment and compliant work.
Can the DISCOM still reject the system after feasibility is waived?
Yes. Final inspection can identify non-compliant equipment, wiring, protection, metering, capacity, documentation or consumer-record issues.
Should I create a new application if feasibility is pending?
Not unless official support instructs you to do so. First check the detailed observation, correct the existing record and use the grievance process.
How can I track the approval after correction?
Use the National Portal consumer dashboard, retain the correction acknowledgement and compare the updated stage using the application-status workflow.
Use the Simplified Rule Without Skipping Technical Compliance
For systems up to 10 kW, the current public scheme position removes the old technical-feasibility burden and introduces automatic load enhancement. Consumers should therefore avoid waiting indefinitely only because an outdated tutorial says that a separate sanction must always arrive before vendor selection.
At the same time, do not let “automatic approval” become a sales shortcut. Confirm the connection, capacity, phase and equipment in writing, use a registered vendor, preserve the records and complete DISCOM inspection and metering. The complete PM Surya Ghar guide , online application guide , and status-tracking guide explain the surrounding stages.
Official Sources
- PM Surya Ghar Muft Bijli Yojana National Portal
- PIB Update on Feasibility Waiver and Auto Load Enhancement – March 2026
- PIB Update on DISCOM Feasibility Simplification – December 2024
- MNRE Grid Connected Rooftop Solar Programme
- MNRE Operational Guidelines for Residential Central Financial Assistance
Disclaimer
Wikisia is an independent informational website and is not affiliated with the Ministry of New and Renewable Energy, PM Surya Ghar Muft Bijli Yojana, any State Electricity Regulatory Commission, DISCOM, bank, registered solar vendor or government authority.
Portal labels, load rules, phase requirements, capacity limits, metering procedures and DISCOM implementation can change. The simplified up-to-10-kW position described here is based on the Government’s public update available on the review date. Verify the live National Portal and obtain connection-specific written confirmation before purchasing equipment, changing load or phase, signing a vendor agreement, beginning installation or filing a complaint.